HomeCitiesMetro 4 Construction Suspended for Safety Review

Metro 4 Construction Suspended for Safety Review

Published on

spot_img


Mumbai Metro 4 Construction Halted After Fatal Incident

Following a fatal parapet collapse at a Mulund metro site on Saturday, the Mumbai Metropolitan Region Development Authority (MMRDA) has suspended all construction on the 32.32-km Metro 4 corridor. The incident resulted in one death.

Key facts:

  • A 13-member “Special Intensive Safety Inspection Team” has been formed to investigate safety lapses along the entire route.
  • MMRDA has informed police that the main contractor, subcontractor, or general consultant may be responsible.
  • Construction will remain suspended until the inspection team submits its report and corrective measures are implemented.
  • The inspection will cover all aspects of the construction.

Source



Source link

Latest articles

Cuba Deals With Diesel and Oil Shortages

Mexico Faces Fuel Oil Deficiency Despite Gas...

Trump, Xi Navigate Trade and Taiwan Tensions.

Beijing Summit Aims for Business Increase Amidst...

Delhi Local Defrauded in Overseas Task Fraud; Suspect Arrested

Delhi Cops Bust Overseas Work Scam, Apprehension...

More like this

Cuba Deals With Diesel and Oil Shortages

Mexico Faces Fuel Oil Deficiency Despite Gas...

Trump, Xi Navigate Trade and Taiwan Tensions.

Beijing Summit Aims for Business Increase Amidst...