Water discharge continues for one month within the downstream of Bisalpur Dam, 31.3 TMC water has come out of the dam to this point.

Related

Share


Jaipur: Discharge of water continues within the downstream of Bisalpur dam for a month. However, the discharge of water has diminished from one lakh cusecs to solely 300 cusecs. Gate quantity 9 is open at a peak of solely 0.5 meters.

If water discharge doesn’t influx, it may be stopped inside 48 hours. So far 31.3 TMC water has been launched from the dam. Whereas the entire filling capability of the dam is 38.70 TMC water.





Source link

spot_img