Nagaur: A newly constructed 3 kilometer 4 lane street has been constructed from Vijay Vallabh Square in Nagaur metropolis to Manasar ROB through Mundwa Square. But in accordance with folks, this can be a street constructed with out respecting the foundations and laws, which is able to turn into a reason behind hassle within the coming days.
According to consultants, the doorway of the drain made for drainage of water on this street is above the street. This implies that waterlogging is for certain right here. To forestall waterlogging on each side of the street, two huge parallel drains of three km size have been constructed on each side. But it’s troublesome for them to empty water throughout rains. Because the small drains made to hold water into these drains have been positioned 2 to 4 inches above the street.
Actually, the work of 4 lane undertaking costing round Rs 35.24 crore is within the remaining stage. In such a state of affairs, questions are being raised concerning the drainage of water filling the 4 lanes and surrounding areas throughout rains. Two huge parallel drains of three km size have been made on each side of the 4 lane, in order that there isn’t a downside of water logging from Vijay Vallabh Square to Manasar, 9.5-9 meter CC has been made on each side of the divider of the 4 lane. Interlocking blocks are being laid in further 2-2 meter width. When we talked about this
When we talked to NH AEN Anuj Kumar, he stated that the work of 4 lane is now within the remaining stage and the work of putting in CC blocks between the street and drains is occurring, which is 70 p.c full. In each the drains, the drainage gates have been positioned at some locations larger up within the east. Now, as quickly because the work of putting in CC blocks is accomplished, new gates will probably be made in order that water doesn’t stagnate on the street. Will clear up it quickly.
Let us let you know that the Ministry of Road Transport and National Highways of the Central Government has sanctioned Rs. 35.24 crore for this 4 lane of about 3 kilometers to be constructed from Vijay Vallabh intersection of Nagaur metropolis to Manasar ROB through Mundwa intersection, which has been beneath development for nearly 7 years. Had sanctioned Rs.