Before the departure of monsoon, the gates of Rana Pratap Sagar Dam opened once more, water is being drained by opening 2 gates.

Related

Share


Chittorgarh: Big information is coming from Rawatbhata of Chittorgarh. Before the departure of monsoon, the gates of Rana Pratap Sagar Dam opened once more. The largest dam of the Chambal River Valley Project is Rana Pratap Sagar. This morning, water is being drained by opening 2 gates of Rana Pratap Sagar Dam.

Due to rain within the final 3 days in Indore and Ujjain of Madhya Pradesh, water is coming in. The influx of water began after the arrival of 1 lakh cusecs of water in Gandhi Sagar catchment. On the opposite hand, water is being drained by opening 3 gates of Gandhi Sagar Dam.

The water of Gandhi Sagar Dam comes into Rana Pratap Sagar Dam. 60 thousand cusecs of water is coming into Gandhi Sagar Dam. The full filling capability of Rana Pratap Sagar Dam is 1157.50 ft. There is at present 1157.30 ft of water in Rana Pratap Sagar Dam. First one gate was opened at 10 am and at 12 midday the second gate was opened and drainage of water began.





Source link

spot_img